The tunnel will transit soft
ground and rock along each end of the tunnel alignment and mixed face
conditions shall be anticipated for reaches along these subsurface transitions
with the following expected proportions:
-
23 % of soil engineering units 1 and 2,
-
63 % of the rock engineering unit and
-
14 % of mixed ground.
Additional Construction Works
The construction includes also a
11.3 m diameter baffle drop shaft, an around 15 m reinforced concrete box
culvert which is close to the surface, a ventilation shaft with 61 cm diameter,
more than 51 m open cut steel pipe installation with 2.3 m diameter, a more
than 38 m long jacked steel pipe with 2.3 m diameter, an energy dissipation
structure, site restoration and further various job site works.
The construction works are
expected to be complete in mid to end of 2019.
LOVSUNS Tunneling Canada Ltd.
LOVSUNS, former Lovat which was
sold to Caterpillar, carried on the Tunnel Boring Business as the wholly owned
subsidiary of Liaoning Censcience Industry Co. Ltd. – LNSS only one month after
the Caterpillar Tunneling assets were sold to the Chinese LNSS in November 2014
with the order of the 3.9 m diameter EPB TBM to bore two wastewater tunnels in
Istanbul, Turkey.
Further TBM orders for several
drives of the new Metro Line extensions followed. "We designed and
engineered tailormade TBMs for Istanbul and now for the US-market in Toronto
and completely produced the TBMs in the facility in Liaoyang China. That means
that we very successfully united the best practice, knowledge and technology of
both companies for the highest advantage of our customers", explains
Hongyu Xue, General Manager of LOVSUNS Tunneling Canada Ltd.